Central Alabama (Serving Birmingham, Hoover, Trussville, Pell City & Surrounding Areas)
(205) 965-3701
Custom Deck Building & Outdoor Living
Services/Custom Deck Building & Outdoor Living

Custom Deck Building & Outdoor Living

Premium wooden, composite, and multi-tiered deck construction engineered for beauty and structural longevity.

5-Year Workmanship Warranty⭐ 5 Rating in Central AL

Service Overview

At Tyler Construction, we specialize in custom deck building that transforms outdoor living spaces across Central Alabama. Backed by over 30 years of hands-on structural construction expertise, we craft pressure-treated timber and low-maintenance composite decks (including Trex & TimberTech) built to withstand local climate conditions while delivering solid engineering and curb appeal.

Capabilities & Technical Specifications

Custom multi-tiered timber & composite deck construction
Structural reinforcement & code-compliant concrete footings
Custom aluminum, vinyl, timber, or cable railing installations
Integrated LED riser, post, & stair safety lighting
Built-in bench seating, custom steps & accent features
Concealed fastener systems for smooth deck surfaces

Key Benefits for Homeowners

✓

Extends usable outdoor entertainment space year-round

✓

Substantially increases total property valuation & equity

✓

Low-maintenance composite material warranties up to 25-30 years

✓

Heavy-duty structural framing built for heavy safety tolerances

Our Step-by-Step Construction Process

01

Site Assessment & Consultation

We evaluate grade elevations, drainage, sun angles, and design preferences.

02

Architectural Layout & Specs

3D plan layout, material selection, code calculations, and upfront line-item pricing.

03

Permitting & Footings

We pull municipal permits and pour deep, code-compliant concrete footings.

04

Precision Framing & Decking

Heavy-gauge framing, ledger board flashings, and precision board installation.

05

Final Walkthrough & Warranty

Detailed safety inspection and handover of craftsmanship & material warranties.

Custom Deck Building & Outdoor Living FAQs

Q: How long does custom deck building take?

Most residential custom decks take between 1 to 2 weeks from initial site excavation to final completion, depending on size and weather.

Q: Do you handle local municipal building permits?

Yes, Tyler Construction handles all local municipal permits, inspection schedules, and setback compliance.

Q: Composite vs. Wood: Which is right for Central Alabama?

Composite offers virtually zero maintenance and no splintering, while natural pressure-treated wood offers classic warm aesthetic value at a lower upfront investment.

Direct Contractor Response

Get a Free Custom Deck Building & Outdoor Living Estimate

Direct response from lead contractor Troy Tyler within 24 hours.

🔒 Your privacy is respected. Licensed & Insured Deck and Concrete Experts.

Verified Homeowner Feedback